Module code | BPZ 782 |
Qualification | Postgraduate |
Faculty | Faculty of Engineering, Built Environment and Information Technology |
Module content | · Random variables review · Forecasting models: Time Series models (Review); Regression models (Review); Auto regression and noise models; Integrated models (Causal and time series); Model selection techniques · Aggregate planning models: Spread sheet models; MP models of Aggregate Planning (LP, DP, QP, GP, SP applications); Constrained systems models (Lagrangean) · Lot sizing and disaggregation models: System characterisation and notations; Single item models (EOQ, EPQ, back ordering, discount, deteriorating, etc.); Dynamic Economic Lot models (DP and heuristics); Joint item lot sizing models; Multi echelon models; Safety stock modelling; Joint item disaggregation models with opening/target inventories · Scheduling models: System characterisation and notations; Single and two machine/s sequencing models; Flow scheduling models; Job shop scheduling models; Constraint scheduling models; Line balancing techniques · Overview of some pull based techniques |
Module credits | 16.00 |
Programmes | |
Prerequisites | BOB 310 |
Contact time | 48 contact hours per semester |
Language of tuition | English |
Academic organisation | Industrial and Systems Eng |
Period of presentation | Semester 1 or Semester 2 |
Copyright © University of Pretoria 2024. All rights reserved.
Get Social With Us
Download the UP Mobile App